Connecting Worldwide Skills with Energy Projects

APPLY TO THIS JOB!

Please wait while we fetch your resume and information...
This job is no longer available

Similar Jobs

SCHEMA MARKUP ( This text will only show on the editor. )
TRANSPORT and INSTALLATION ENGINEER ON WIND FARM PROJECT

Work type : 

Permanent - Freelance - Portage Salarial

Location : 

Nearby Paris, Île-de-France, France

Sector : 

Renewable Energy

Category : 

Engineering

Role : 

Subsea Methods Engineer

Share job : 

About us :

Abyss Energy is a consulting firm specializing in engineering and recruitment within the Energy sector ⚡.

We collaborate on large-scale projects across three key segments:

  • Renewable Energy
  • Conventional Energy
  • Environmental and Process


Job Description :

Seniority: Between 3-6 year’s experience in T&I offshore wind, with design background

Location & travel: Paris, Lille, Noirmoutier area, Treport area

Job Purpose: Supporting the T&I package


Activity 1: Support to the T&I team on installation works during EPCI Engineering and Installation phase.
  • Collaborate with interdisciplinary teams, including structural engineers, geotechnical engineers, hydrologists, and project managers, to ensure successful project execution.
  • Communicate effectively with T&I Manager, and contractors, to convey technical information and project updates.
  • Provide technical expertise and support to colleagues and team members.

Activity 2: Support on the grouting strategy process and grouting execution works
  • Support the Equipment expert and remaining T&I team in the development of the grouting strategy.
  • Lead the communications with the Laboratory responsible for the grouting tests and ensure internal alignment with Certification Engineer.
  • Follow up potential additional tests (higher temperature and/or testing with greater motions during the first 3h), or follow up even in case of redoing the tests already made and which led to the “decolouration default”.
  • Interpret and follow up on the grout “strength curves” produced by the Contractors. Control the results of the grout “strength curves”
  • Support on technical and design clarifications
  • Address any technical issues or modifications required during construction
  • Identify areas for improvement.

Activity 3: Maintaining the necessary trackers.
  • Support with update of the tracker whenever interactions with DEME and Boskalis occur, comments are sent back and ensure that within Project team, all comments are fully integrated.
  • Review all As-built submitted within T&I for NOY and TRE OWF, keeping a track of all as-built and reports, as well as their status.
  • Consolidate and distribute the as-built to the engineer in charge of the live update of Field layout master drawing.
  • Prepare NCR when needed

Activity 4: Consolidation of DPRs, installation vessel weather stand-by
  • Reading the Contractor’s DPR and interpreting them to produce intelligence and learnings

Activity 5: Other tasks
  • Support the review of documentation and preparation of reports and Notes
  • Preparation of monthly activity reports
Share by: