CLOV 3, an EPCI SURF project in Angola!
A subsea tie-back to the existing CLOV FPSO to develop additional production
Key Figures
- Located about 140 km offshore from Luanda, Angola
- In water depths between 1,100 m and 1,400 m,
- TotalEnergies invest $850 million in Phase 3 of Angolan Block 17
- CLOV Phase 3 development project comprises the extension of the submarine infrastructure and five new wells
Abyssien contribution
- Risers, Installation Analyses and Umbilical (RIAU) studies
- Develop design brief and perform the installation analysis using Orcaflex
- Ensure design and analysis are in accordance with industry Codes & Standards
- Flowline Line engineering
- Perform pipeline design activities: sizing, stability, FEM analyses for lateral buckling and pipeline walking
- Provide support to procurement activities: MTOs, follow-up of supplier offers and technical deliverables
Client

